新闻资讯

风电基础模具的详细生产过程

2019-11-05 16:39:28

风电基础模具在开始安装之前,需要对模具的整体钢板以及各个零部件进行详细的检查,并进行登记。模具一般都是使用吊车进行吊装的方式进行搬运,然后将其运送到我们进行安装时的位置,提前做好准备。为了保证位置的准确性,施工工人可以提前进行放线,将预估的位置划定出来。然后,放置好之后,通过人工搬运的方法进行细节的调整,让精度更高,然后使用固定装置将其进行固定,能够更好的保障工程质量。风电基础模具是钢板上出现了污渍的话,应该将其拆卸下来进行清洗,然后再进行装配。确认好无问题之后,即可进行混凝土的浇筑生产。

Before the installation of wind power basic mold, the overall steel plate of the mold and various parts shall be inspected in detail and registered. Generally, the mold is lifted by crane, and then transported to the location where we are installing, and prepared in advance. In order to ensure the accuracy of the location, the construction workers can set out in advance and demarcate the estimated location. Then, after placing, adjust the details by manual handling to make the accuracy higher, and then fix it with fixed device, which can better guarantee the project quality. If there is a stain on the steel plate of the wind power basic mould, it should be disassembled for cleaning and then assembled. After confirming that there is no problem, the concrete pouring production can be carried out.

风电基础模具风电工程上都是可以运用到的一种工具,如果现在我们生活中没有这项技术,还有这种工具的出现,那么我们的生活环境肯定是非常恶劣的,那么正因为现在的风电基础模具的大范围使用,所以我们的生活条件还有空气质量,都非常的好,并且很多的地方都得到了相应的改善。那么现在河北省很多的建设工程都在使用这一项技术,只要是正在建设风电工程的地方,基本都会使用到该模具。

Wind power basic mold is a kind of tool that can be used in wind power engineering. If we don't have this technology in our life now and the appearance of this tool, then our living environment must be very bad. Because of the wide use of wind power basic mold now, our living conditions and air quality are very good, and many of them Local areas have been improved accordingly. Now many construction projects in Hebei Province are using this technology. As long as the wind power project is under construction, the mold will be basically used.

联系方式
ico04
联系人

边经理

ico01
电话

0312-8103818

ico06
手机

18803129528

ico05
QQ

107108222

ico03
邮箱

925474963@qq.com

ico02
地址

河北省保定市清苑区阎庄乡高庄村